Excavation Of Tail Tunnel • Perfect Steerable Transfer Cartluding time for Survey, Drilling, Blowing, Loading, Blasting, De fuming and Scaling, lowering and lifting of Equipment, Mucking, Shot Crete, Rock Bolt and wire mesh, the total cycle time for Tail Tunnel Heading Pilot (6.0m x 6.0m