3/9/2014 · These spans are short-span beam construction, longest span 45m, therefore the cost function is 6000 e(0.012×45), which comes to $10,296/lane-metre. Multiply by (11.5 x 973) gives a section cost of $115,208,000. Therefore the total cost of the bridge is the sum of